Commit Graph

6 Commits

Author SHA1 Message Date
Harshavardhana fe157166ca
fix: Pass context all the way down to the network call in lockers (#10161)
Context timeout might race on each other when timeouts are lower
i.e when two lock attempts happened very quickly on the same resource
and the servers were yet trying to establish quorum.

This situation can lead to locks held which wouldn't be unlocked
and subsequent lock attempts would fail.

This would require a complete server restart. A potential of this
issue happening is when server is booting up and we are trying
to hold a 'transaction.lock' in quick bursts of timeout.
2020-07-29 23:15:34 -07:00
Klaus Post 3ba4804d6c
Move online status to REST client (#9808) 2020-06-16 18:59:32 -07:00
Harshavardhana e9b2bf00ad Support MinIO to be deployed on more than 32 nodes (#8492)
This PR implements locking from a global entity into
a more localized set level entity, allowing for locks
to be held only on the resources which are writing
to a collection of disks rather than a global level.

In this process this PR also removes the top-level
limit of 32 nodes to an unlimited number of nodes. This
is a precursor change before bring in bucket expansion.
2019-11-13 12:17:45 -08:00
Harshavardhana 6a4ef2e48e Initialize configs correctly, move notification config (#8367)
This PR also removes deprecated tests, adds checks
to avoid races reproduced on CI/CD.
2019-10-09 11:41:15 +05:30
Krishna Srinivas 338e9a9be9 Put object client disconnect (#7824)
Fail putObject  and postpolicy in case client prematurely disconnects
Use request's context to cancel lock requests on client disconnects
2019-06-28 22:09:17 -07:00
kannappanr d2f42d830f
Lock: Use REST API instead of RPC (#7469)
In distributed mode, use REST API to acquire and manage locks instead
of RPC.

RPC has been completely removed from MinIO source.

Since we are moving from RPC to REST, we cannot use rolling upgrades as the
nodes that have not yet been upgraded cannot talk to the ones that have
been upgraded.

We expect all minio processes on all nodes to be stopped and then the
upgrade process to be completed.

Also force http1.1 for inter-node communication
2019-04-17 23:16:27 -07:00